Monitoring smart meter roll-out

In line with section 2(1) Intelligente Messgeräte-Einführungs-Verordnung (Smart Meter Rollout Ordinance), E-Control monitors the roll-out of smart meters by system operators across Austria. The Ordinance obliges system operators to submit information on several points by 31 March of each year:
 
  • Progress with installations
  • Experience with data protection
  • Evolution of consumers’ energy demand
  • Network condition


This information is collected and used by E-Control to draw up an annual report on smart meter roll-out. The reports are available from our German pages.